Seattle City Light net metering update

Apply before May 1, 2027 to keep net metering for the life of your system

The window for lifetime net metering is closing. Plan to sign no later than February 2027.

Solar panels on a metal roof on the Seattle waterfront, installed by Blossom Solar

What City Light announced

Apply before May 1, 2027
Net metering for the life of your system.
Apply after May 1, 2027
Net metering for 20 years, then City Light’s solar rate at that time.

“Apply” means submitting your interconnection application to City Light. City Light does not expect to launch its replacement solar rate until at least January 2029. Net metering is offered as long as your Interconnection Agreement with City Light remains valid.

  1. February 2027Our recommended sign-by date. The application needs a signed contract and a final design first.
  2. May 1, 2027City Light’s cutoff. Applications submitted before this date get net metering for the life of the system.
  3. January 2029The earliest City Light expects to launch the solar rate that replaces net metering.

Why net metering matters

Net metering lets you bank the extra power your panels make. When your system produces more than your home is using, the excess goes to the grid and City Light credits you for every kilowatt-hour, one for one. Our long summer days build up credits that carry your home through the darker months.

A solar system is built to produce for well beyond 20 years, so applying before the cutoff protects the value of your system over its full life.

Diagram of a home with solar panels sending power through the main service panel and net meter to the grid

How net metering works with City Light

Your City Light meter measures power in both directions: what you take from the grid, and what your panels send back.

A credit for every kilowatt-hour

City Light gives you a kilowatt-hour credit for the energy you send to its grid. Credits are valued at your retail rate, the same rate you pay for power.

You pay for your net use

Credits are applied to your bill automatically. Each bill period you pay only for the difference between what you used and what you sent back.

Extra credits carry forward

In a bill period where you make more than you use, the extra credits are added to your balance and used on later bills. That is how summer production covers winter use.

The credit year ends March 31

Under Washington law, any credits still unused on March 31 each year go to the utility without payment.

No extra solar charge

State law has net metering customers pay the same minimum monthly charge as other customers in their rate class.

Home systems qualify

The program covers systems up to 100 kilowatts AC. City Light says the average home system in Seattle is 8 kilowatts.

Sources: Seattle City Light, Solar Power; Washington law, RCW 80.60.020 and RCW 80.60.030.

Why net metering is unusual

With net metering, a kilowatt-hour you send to the grid on a July afternoon is worth the same as one you buy on a January night. The grid works like a bank for your solar power, and the exchange is one for one.

Washington law never promised that arrangement for good. It requires utilities to offer net metering only until June 30, 2029, or until a utility’s net-metered systems reach 4% of its 1996 peak demand, whichever comes first. Washington State University’s Energy Program put City Light at about 93% of that limit as of January 31, 2026.

Utilities are already moving on. The same WSU list shows four Washington utilities that have adopted their own rules in place of standard net metering. California moved new solar customers from net metering to a different billing structure in April 2023, and the Washington State Academy of Sciences counts six states that approved replacement programs in 2025 alone.

Sources: RCW 80.60.020; WSU Energy Program, Net Metering; U.S. Energy Information Administration, July 18, 2024; Washington State Academy of Sciences, Beyond Net Metering, October 2026.

City Light is replacing net metering, not pausing it

City Light’s notice describes a new solar rate “to replace net metering.” The change comes in steps.

  1. May 1, 2027Applications submitted after this date no longer get net metering for the life of the system. They get net metering for 20 years.
  2. When the new rate launches, no sooner than January 2029City Light’s notice offers net metering only to systems connected before that launch.
  3. June 30, 2029Washington law no longer requires any utility to offer net metering to new customers.

City Light has not announced any way to get life-of-system net metering after May 1, 2027. Neither City Light nor the state has announced a plan to bring net metering back once it is replaced.

Homeowners who apply before the cutoff keep net metering for the life of their system, as long as their Interconnection Agreement with City Light remains valid.

Sources: Seattle City Light, Net Metering Update; RCW 80.60.020.

Plan to sign by February 2027

The interconnection application is not the first step. It comes after your contract is signed and your system design is final, so we recommend signing no later than February 2027.

Not sure City Light is your utility? Some addresses in SeaTac, Tukwila and Des Moines are served by PSE, not City Light. Check your electric bill, or ask us and we will confirm it for your address.

Common questions

I already have solar with City Light. Does anything change?

No. Current solar customers keep net metering for the life of the system, as long as the Interconnection Agreement stays valid.

What if I apply after May 1, 2027?

You can still go solar. If your application goes in before City Light launches its new rate, net metering is limited to 20 years. After that, City Light enrolls you in the solar rate it offers at that time.

Do my panels have to be installed by May 1, 2027?

City Light’s cutoff applies to the date your interconnection application is submitted. Its notice does not name an install date.

What does “as long as your Interconnection Agreement stays valid” mean?

Your Interconnection Agreement is your contract with City Light to connect solar to the grid. City Light says an agreement may become invalid for any violation of its terms. Under the current standard agreement, the main ones are: keep your system operating, since City Light can end the agreement if it sits idle for 12 months in a row; get City Light’s written approval before changing equipment or wiring; and keep the system maintained. The agreement gives you 30 days to fix a serious breach after written notice. The agreement also lets City Light end it with 20 business days’ written notice. If you sell your home, the new owner signs on with City Light. Your own agreement has the exact terms.

What will the new solar rate pay?

City Light has not said. It will update its solar page as the rate is developed.

My power comes from PSE or Snohomish PUD. Does this apply to me?

No. This update is for Seattle City Light customers only. Each utility sets its own rules, and we can walk you through yours.

Will net metering come back later?

City Light has not said so. Its notice describes a new solar rate to replace net metering, and Washington law does not require utilities to offer net metering to new customers after June 30, 2029.

Do my net metering credits expire?

Credits carry forward from bill to bill. Under Washington law, any credits still unused on March 31 each year go to the utility without payment.

Read more about net metering

These links go to outside organizations. Blossom Solar does not control what they publish.

Why homeowners choose Blossom

Our own crews

You only deal with Blossom employees. We don’t subcontract our work.

10-year workmanship guarantee

If something we installed fails or damages your roof, we fix it.

No pressure

We share the details we would want to see if we were buying solar, and you decide.

Always in the loop

Every project gets its own web dashboard, from signing to switch-on.

A Blossom Solar representative talking with a homeowner in her driveway

Speak with a Sales & Design Consultant

See what solar would look like on your home, with time to apply before May 1, 2027.

Source: Seattle City Light, Net Metering Update, November 16, 2026. Read the notice on City Light’s solar page. Net metering is offered as long as your Interconnection Agreement with City Light remains valid. This page is an overview and does not represent Seattle City Light.